Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time (Q2342682): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 3 users not shown)
Property / author
 
Property / author: Ling-Fa Lu / rank
Normal rank
 
Property / author
 
Property / author: Ling-Fa Lu / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.tcs.2015.03.046 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1991992062 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation algorithms for two-machine open shop scheduling with batch and delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Design and operational issues in AGV-served manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a two-machine flowshop with travel times to minimize maximum lateness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Makespan minimization for flow-shop problems with transportation times and a single robot / rank
 
Normal rank
Property / cites work
 
Property / cites work: Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved algorithms for two single machine scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: SINGLE MACHINE SCHEDULING WITH JOB DELIVERY TO MINIMIZE MAKESPAN / rank
 
Normal rank
Property / cites work
 
Property / cites work: Unbounded parallel batch scheduling with job delivery to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with release dates and job delivery to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with Deadlines and Loss Functions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3883869 / rank
 
Normal rank
Property / cites work
 
Property / cites work: ON EQUIVALENT-JOB FOR JOB-BLOCK IN 2×n SEQUENCING PROBLEM WITH TRANSPORTATION-TIMES / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of a Two-machine Flowshop with Travel Time Between Machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the two-machine open-shop scheduling problem with transportation times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Complexity of flow shop scheduling problems with transportation constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new heuristic algorithm for the machine scheduling problem with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Parts in a Combined Production-transportation Work Cell / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for parallel machine scheduling with delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with an availability constraint and job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling with supply and delivery considerations to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the complexity of flow shop scheduling with transportation constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the machine scheduling problem with job delivery coordination / rank
 
Normal rank

Latest revision as of 00:18, 10 July 2024

scientific article
Language Label Description Also known as
English
Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
scientific article

    Statements

    Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time (English)
    0 references
    0 references
    0 references
    0 references
    29 April 2015
    0 references
    preemptive scheduling
    0 references
    identical machines
    0 references
    delivery coordination
    0 references
    NP-hard
    0 references
    approximation algorithm
    0 references
    0 references
    0 references

    Identifiers