The uncertainty recovery analysis for interdependent infrastructure systems using the dynamic inoperability input–output model (Q5252920): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207721.2013.822121 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2042544694 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decision support for supply chain planning under uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Statistical Methods for Eliciting Probability Distributions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Protecting complex infrastructures against multiple strategic attackers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Identification of filter management strategy in fluid power systems under uncertainty: an interval-fuzzy parameter integer nonlinear programming method / rank
 
Normal rank
Property / cites work
 
Property / cites work: Nonlinear airpath control of modern diesel powertrains: a fuzzy systems approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy modeling of system behavior for risk and reliability analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: A supplier selection and order allocation problem with stochastic demands / rank
 
Normal rank

Latest revision as of 03:54, 10 July 2024

scientific article; zbMATH DE number 6442571
Language Label Description Also known as
English
The uncertainty recovery analysis for interdependent infrastructure systems using the dynamic inoperability input–output model
scientific article; zbMATH DE number 6442571

    Statements

    The uncertainty recovery analysis for interdependent infrastructure systems using the dynamic inoperability input–output model (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    3 June 2015
    0 references
    interdependent infrastructure sectors
    0 references
    DIIM
    0 references
    uncertainty recovery
    0 references
    random time distribution
    0 references
    Monte Carlo simulation
    0 references

    Identifiers