Interactive bicriterion decision support for a large scale industrial scheduling system (Q2347596): Difference between revisions

From MaRDI portal
Created claim: Wikidata QID (P12): Q58902976, #quickstatements; #temporary_batch_1708296850199
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10479-013-1406-4 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2092844426 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines to level parts usage and minimize line length / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics and exact algorithms for solving the Monden problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An exact \(\epsilon\)-constraint method for bi-objective combinatorial optimization problems: Application to the traveling salesman problem with profits / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing mixed-model assembly lines: survey, classification and model critique / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3760254 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3567139 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constructing robust crew schedules with bicriteria optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Trends in multiple criteria decision analysis. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple criteria decision analysis. State of the art surveys / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—Sequencing JIT Mixed-Model Assembly Lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing variation of production rates in just-in-time systems: A survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient, adaptive parameter variation scheme for metaheuristics based on the epsilon-constraint method / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effective implementation of the \(\varepsilon \)-constraint method in multi-objective mathematical programming problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Nonlinear multiobjective optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Developing production schedules which balance part usage and smooth production loads for just-in-time production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Multi-Objective Particle Swarm for a Mixed-Model Assembly Line Sequencing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A New Approach for Mixed-Model Assembly Line Sequencing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective particle swarm for a flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Level Schedules for Mixed-Model, Just-in-Time Processes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria scheduling problems: a survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria sequencing for just-in-time mixed-model assembly lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines / rank
 
Normal rank

Latest revision as of 05:08, 10 July 2024

scientific article
Language Label Description Also known as
English
Interactive bicriterion decision support for a large scale industrial scheduling system
scientific article

    Statements

    Interactive bicriterion decision support for a large scale industrial scheduling system (English)
    0 references
    0 references
    0 references
    0 references
    5 June 2015
    0 references
    0 references
    multiple objective programming
    0 references
    interactive decision analysis
    0 references
    job scheduling
    0 references
    Pareto optimality
    0 references
    mixed-model assembly line
    0 references
    0 references
    0 references
    0 references
    0 references