Capacity consumption analysis using heuristic solution method for under construction railway routes (Q291652): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: SPOT / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s11067-014-9223-0 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2019558196 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q125888380 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Genetic Algorithm for Railway Scheduling Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fine-Tuning of Algorithms Using Fractional Experimental Designs and Local Search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust facility location problem for hazardous waste transportation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Railway Timetabling Using Lagrangian Relaxation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Design of a railway scheduling model for dense services / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Model, Algorithms and Strategy for Train Pathing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using experimental design to find effective parameter settings for heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: An advanced real-time train dispatching system for minimizing the propagation of delays in a dispatching area under severe disturbances / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for scheduling trains in a railway network / rank
 
Normal rank
Property / cites work
 
Property / cites work: A probabilistic \((\max,+)\) approach for determining railway infrastructure capacity. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust optimization model for a dynamic network design problem under demand uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Local branching / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evaluation of railway networks with single track operation using the UIC 406 capacity method / rank
 
Normal rank
Property / cites work
 
Property / cites work: An analytical approach to calculate the capacity of a railway system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tuning an Algorithm Using Design of Experiments / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved local branching approach for train formation planning / rank
 
Normal rank

Latest revision as of 02:56, 12 July 2024

scientific article
Language Label Description Also known as
English
Capacity consumption analysis using heuristic solution method for under construction railway routes
scientific article

    Statements

    Capacity consumption analysis using heuristic solution method for under construction railway routes (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    10 June 2016
    0 references
    railway routes
    0 references
    capacity consumption
    0 references
    UIC capacity calculation method
    0 references
    train timetabling
    0 references
    discrete-time multicommodity network design model
    0 references
    local branching algorithm
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references