Carbon-efficient scheduling of flow shops by multi-objective optimization (Q320773): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2015.05.019 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W826685547 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pareto simulated annealing—a metaheuristic technique for multiple‐objective combinatorial optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flow shop scheduling with peak power consumption constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: New block properties for the permutation flow shop problem with application in tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling research after five decades / rank
 
Normal rank
Property / cites work
 
Property / cites work: On Finding the Maxima of a Set of Vectors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Operational methods for minimization of energy consumption of manufacturing equipment / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fast tabu search algorithm for the permutation flow-shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some efficient heuristic methods for the flow shop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Evolving better population distribution and exploration in evolutionary multi-objective optimization / rank
 
Normal rank

Latest revision as of 15:57, 12 July 2024

scientific article
Language Label Description Also known as
English
Carbon-efficient scheduling of flow shops by multi-objective optimization
scientific article

    Statements

    Carbon-efficient scheduling of flow shops by multi-objective optimization (English)
    0 references
    0 references
    0 references
    0 references
    7 October 2016
    0 references
    flow shop
    0 references
    carbon efficiency
    0 references
    makespan
    0 references
    total energy consumption
    0 references
    extended NEH-insertion
    0 references

    Identifiers