An integrated search heuristic for large-scale flexible job shop scheduling problems (Q336652): Difference between revisions

From MaRDI portal
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2013.06.010 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2035047474 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4319398 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Applying constraint satisfaction techniques to job shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: An advanced tabu search algorithm for the job shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ant colony optimization combined with taboo search for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Combining Constraint Programming and Local Search for Job-Shop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new hybrid genetic algorithm for job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Routing and scheduling in a flexible job shop by tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for the job-shop scheduling problem with multi-purpose machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effective neighbourhood functions for the flexible job shop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel Tabu Search Algorithm with Uncertain Data for the Flexible Job Shop Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for the flexible job-shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Discrepancy search for the flexible job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving job shop scheduling with setup times through constraint-based iterative sampling: an experimental analysis / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new meta-heuristic algorithm for continuous engineering optimization: harmony search theory and practice / rank
 
Normal rank
Property / cites work
 
Property / cites work: Principles for the design of large neighborhood search / rank
 
Normal rank

Latest revision as of 22:41, 12 July 2024

scientific article
Language Label Description Also known as
English
An integrated search heuristic for large-scale flexible job shop scheduling problems
scientific article

    Statements

    An integrated search heuristic for large-scale flexible job shop scheduling problems (English)
    0 references
    0 references
    0 references
    10 November 2016
    0 references
    0 references
    scheduling
    0 references
    flexible job shop
    0 references
    harmony search
    0 references
    large neighborhood search
    0 references
    makespan
    0 references
    0 references
    0 references