A reclaimer scheduling problem arising in coal stockyard management (Q341465): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 5 users not shown)
Property / author
 
Property / author: Savelsbergh, Martin W. P. / rank
Normal rank
 
Property / author
 
Property / author: Enrico Angelelli / rank
Normal rank
 
Property / author
 
Property / author: Savelsbergh, Martin W. P. / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57955323 / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3098883957 / rank
 
Normal rank
Property / arXiv ID
 
Property / arXiv ID: 1402.4178 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fast heuristic for quay crane scheduling with interference constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: A crane scheduling method for port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for routing yard-side equipment for minimizing loading times in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving rich quay crane scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A <i>m</i>‐parallel crane scheduling problem with a non‐crossing constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling in container yards with inter-crane interference / rank
 
Normal rank
Property / cites work
 
Property / cites work: Yard crane scheduling in port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Routing and Scheduling on a Shoreline with Release Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Special cases of traveling salesman and repairman problems with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Crane scheduling with non-crossing constraint / rank
 
Normal rank

Latest revision as of 23:45, 12 July 2024

scientific article
Language Label Description Also known as
English
A reclaimer scheduling problem arising in coal stockyard management
scientific article

    Statements

    A reclaimer scheduling problem arising in coal stockyard management (English)
    0 references
    0 references
    0 references
    0 references
    16 November 2016
    0 references
    0 references
    reclaimer scheduling
    0 references
    stockyard management
    0 references
    approximation algorithm
    0 references
    complexity
    0 references
    0 references
    0 references
    0 references