A generalized constructive algorithm using insertion-based heuristics (Q342160): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2015.07.009 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1456477517 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An integrated approach for earthwork allocation, sequencing and routing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Three insertion heuristics and a justification improvement heuristic for two-dimensional bin packing with guillotine cuts / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hyper-heuristic approaches for the response time variability problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Capacitated arc routing problem with deadheading demands / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for the dynamic facility layout problem with unequal-area departments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact and heuristic methods for the selective maintenance problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective and simple heuristic for the set covering problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new insertion-based construction heuristic for solving the pickup and delivery problem with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A constructive heuristic for the undirected rural postman problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Construction heuristics for the asymmetric TSP. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Emergency response in natural disaster management: allocation and scheduling of rescue units / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4057549 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Contrasting Structured and Random Permutation Flow-Shop Scheduling Problems: Search-Space Topology and Algorithm Performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review and classification of heuristics for permutation flow-shop scheduling with makespan objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling research after five decades / rank
 
Normal rank
Property / cites work
 
Property / cites work: A comprehensive review and evaluation of permutation flowshop heuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparison of heuristics for flowtime minimisation in permutation flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop-scheduling problems with makespan criterion: a review / rank
 
Normal rank
Property / cites work
 
Property / cites work: Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved NEH heuristic to minimize makespan in permutation flow shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved NEH-based heuristic for the permutation flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some efficient heuristic methods for the flow shop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: New block properties for the permutation flow shop problem with application in tabu search / rank
 
Normal rank

Latest revision as of 22:57, 12 July 2024

scientific article
Language Label Description Also known as
English
A generalized constructive algorithm using insertion-based heuristics
scientific article

    Statements

    A generalized constructive algorithm using insertion-based heuristics (English)
    0 references
    0 references
    0 references
    17 November 2016
    0 references
    NP-complete problems
    0 references
    permutations numbering
    0 references
    flowshop
    0 references
    NEH heuristic
    0 references
    insertion move
    0 references
    makespan
    0 references
    0 references

    Identifiers