Improved heuristic algorithms for the job sequencing and tool switching problem (Q1651541): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: irace / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2017.07.013 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2738101055 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the number of switch instances on a flexible machine in polynomial time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tool magazine arrangement and operations sequencing on CNC machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling identical parallel machines with tooling constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling multi-colour print jobs with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved integer linear programming formulations for the job sequencing and tool switching problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid method with CS and BRKGA applied to the minimization of tool switches problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Combinatorial optimization models for production scheduling in automated manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The tool switching problem revisited / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimization of the Number of Tool Magazine Setups on Automated Machines: A Lagrangean Decomposition Approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic procedures for the parallel machine problem with tool switches / rank
 
Normal rank
Property / cites work
 
Property / cites work: An algorithmic framework for tool switching problems with multiple objectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: New Insertion and Postoptimization Procedures for the Traveling Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving the Job Sequencing and Tool Switching Problem as a nonlinear least cost Hamiltonian cycle problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved tabu search approach for solving the job shop scheduling problem with tooling constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4452900 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The online tool switching problem with non-uniform tool size / rank
 
Normal rank
Property / cites work
 
Property / cites work: A strongly competitive randomized paging algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: \(k\)-server problems with bulk requests: an application to tool switching in manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: The modular tool switching problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: An analysis of variance test for normality (complete samples) / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches / rank
 
Normal rank

Latest revision as of 02:42, 16 July 2024

scientific article
Language Label Description Also known as
English
Improved heuristic algorithms for the job sequencing and tool switching problem
scientific article

    Statements

    Improved heuristic algorithms for the job sequencing and tool switching problem (English)
    0 references
    12 July 2018
    0 references
    scheduling
    0 references
    job sequencing and tool switching problem
    0 references
    iterated local search
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references