Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (Q1788959): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2013.01.050 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2021743472 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The scheduling problem of PCBs for multiple non-identical parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bounded parallel-batch scheduling on single and multi machines for deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bi-objective ant colony optimization approach to optimize production and maintenance scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flowshop scheduling with machine and resource-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling interfering job sets on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordination mechanisms for parallel machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exploiting process plan flexibility in production scheduling: A multi-objective approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with a convex resource consumption function / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling on parallel identical machines with job-rejection and position-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing makespan subject to minimum flowtime on two identical parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel dedicated machines scheduling with chain precedence constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel-machine scheduling with time dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximation schemes for two-agent scheduling on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A united search particle swarm optimization algorithm for multiobjective scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 19:56, 16 July 2024

scientific article
Language Label Description Also known as
English
Solving multi-objective parallel machine scheduling problem by a modified NSGA-II
scientific article

    Statements

    Solving multi-objective parallel machine scheduling problem by a modified NSGA-II (English)
    0 references
    9 October 2018
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    job sequencing
    0 references
    multi-objective evolutionary algorithm (MOEA)
    0 references
    NSGA-II (non-dominated sorting genetic algorithm-II)
    0 references
    SPEA2
    0 references
    0 references