Optimal production schedule in a single-supplier multi-manufacturer supply chain involving time delays in both levels (Q1716998): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.3934/jimo.2017080 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2759691223 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Control theory concepts in production and inventory control / rank
 
Normal rank
Property / cites work
 
Property / cites work: Synthesis of control policies for cascaded production-inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3517228 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Measuring and avoiding the bullwhip effect: A control theoretic approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Nonlinearly constrained time-delayed optimal control problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modal control of production-inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modelling the dynamics of supply chains / rank
 
Normal rank
Property / cites work
 
Property / cites work: The stability of supply chains / rank
 
Normal rank
Property / cites work
 
Property / cites work: A robust implementation of a sequential quadratic programming algorithm with successive error restoration / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Application of Servomechanism Theory in the Study of Production Control / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4001347 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control computation for linear time-lag systems with linear terminal constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal feedback production for a single-echelon supply chain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal control computation for nonlinear time-lag systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Control parametrization method for free planning time optimal control problems with time-delayed arguments. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Visual MISER: an efficient user-friendly visual program for solving optimal control problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid time-scaling transformation for time-delay optimal control problems / rank
 
Normal rank

Latest revision as of 02:41, 18 July 2024

scientific article
Language Label Description Also known as
English
Optimal production schedule in a single-supplier multi-manufacturer supply chain involving time delays in both levels
scientific article

    Statements

    Optimal production schedule in a single-supplier multi-manufacturer supply chain involving time delays in both levels (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    5 February 2019
    0 references
    0 references
    0 references
    0 references
    0 references
    optimal control
    0 references
    supply chain problem
    0 references
    single-supplier multimanufacturer
    0 references
    time delays in the production process
    0 references
    multiple time delays
    0 references
    0 references