A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production (Q2293881): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.apm.2017.03.067 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2604905518 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Charge Batching and Casting Width Selection at Baosteel / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective co-evolutionary artificial bee colony algorithm for steelmaking-continuous casting scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex / rank
 
Normal rank
Property / cites work
 
Property / cites work: The hot strip mill production scheduling problem: A tabu search approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling optimization algorithm for the hot rolling processes / rank
 
Normal rank
Property / cites work
 
Property / cites work: The hot-rolling batch scheduling method based on the prize collecting vehicle routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review and classification of heuristics for permutation flow-shop scheduling with makespan objective / rank
 
Normal rank
Property / cites work
 
Property / cites work: A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Location of cross-docking centers and vehicle routing scheduling under uncertainty: a fuzzy possibilistic-stochastic programming model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-bound algorithm for the single machine sequence-dependent group scheduling problem with earliness and tardiness penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Local optimization of dynamic programs with guaranteed satisfaction of path constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Global finite-time stabilization of a class of switched nonlinear systems with the powers of positive odd rational numbers / rank
 
Normal rank

Latest revision as of 17:22, 21 July 2024

scientific article
Language Label Description Also known as
English
A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production
scientific article

    Statements

    A mathematical model and two-stage heuristic for hot rolling scheduling in compact strip production (English)
    0 references
    0 references
    5 February 2020
    0 references
    scheduling
    0 references
    heuristic
    0 references
    hot rolling
    0 references
    compact strip production
    0 references
    0 references

    Identifiers