An improved algorithm for a two-stage production scheduling problem with an outsourcing option (Q2034787): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.tcs.2021.05.022 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3165185214 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Brownian Approximation of a Production-Inventory System with a Manufacturer That Subcontracts / rank
 
Normal rank
Property / cites work
 
Property / cites work: Competition and Outsourcing with Scale Economies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization of processing and delivery decisions involving third-party machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: An ILP-based Proof System for the Crossing Number Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-machine flow shop scheduling problem with an outsourcing option / rank
 
Normal rank
Property / cites work
 
Property / cites work: Min-max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty / rank
 
Normal rank
Property / cites work
 
Property / cites work: Outsourcing and scheduling for two-machine ordered flow shop scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The longest processing time rule for identical parallel machines revisited / rank
 
Normal rank
Property / cites work
 
Property / cites work: TWO-MACHINE FLOW SHOP SCHEDULING WITH INDIVIDUAL OPERATION'S REJECTION / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-stage production scheduling with an outsourcing option / rank
 
Normal rank
Property / cites work
 
Property / cites work: The coordination of single-machine scheduling with availability constraints and delivery / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with an outsourcing option on both manufacturer and subcontractors / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply chain scheduling to minimize holding costs with outsourcing / rank
 
Normal rank

Latest revision as of 01:52, 26 July 2024

scientific article
Language Label Description Also known as
English
An improved algorithm for a two-stage production scheduling problem with an outsourcing option
scientific article

    Statements

    An improved algorithm for a two-stage production scheduling problem with an outsourcing option (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    23 June 2021
    0 references
    0 references
    0 references
    0 references
    0 references
    scheduling
    0 references
    flow shop
    0 references
    outsourcing
    0 references
    approximation algorithm
    0 references
    worst-case analysis
    0 references
    0 references