Finding efficient make-to-order production and batch delivery schedules (Q2242200): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2021.04.020 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3155234362 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A zero-inventory production and distribution problem with a fixed customer sequence / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing with due-dates and early start times to minimize maximum tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling independent tasks to reduce mean finishing time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling to minimize weighted earliness subject to no tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production and Outbound Distribution Scheduling: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A fixed interval due-date scheduling problem with earliness and due-date costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and distribution scheduling with a perishable product / rank
 
Normal rank
Property / cites work
 
Property / cites work: A probabilistic heuristic for a computationally difficult set covering problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Greedy randomized adaptive search procedures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Coordinated scheduling of production and delivery with production window and delivery capacity constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and outbound distribution scheduling problems with job release dates and deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Commitment-penalty contracts in drop-shipping supply chains with asymmetric demand information / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Processor Scheduling with Start-Times and Deadlines / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Generalized Insertion Heuristic for the Traveling Salesman Problem with Time Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4352217 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling with Fixed Delivery Dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Reducibility among Combinatorial Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5519710 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Sequencing of a Single Machine Subject to Precedence Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the fixed interval due-date scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and distribution with fixed delivery departure dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Weighted Total Tardiness Problem with Fixed Shipping Times and Overtime Utilization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for the Assignment and Transportation Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: GRASP with exterior path-relinking and restricted local search for the multidimensional two-way number partitioning problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Set covering with almost consecutive ones property / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with delivery dates and cumulative payoffs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing the processing of incoming mail to match an outbound truck delivery schedule / rank
 
Normal rank

Latest revision as of 03:05, 27 July 2024

scientific article
Language Label Description Also known as
English
Finding efficient make-to-order production and batch delivery schedules
scientific article

    Statements

    Finding efficient make-to-order production and batch delivery schedules (English)
    0 references
    0 references
    0 references
    9 November 2021
    0 references
    0 references
    0 references
    0 references
    0 references
    scheduling
    0 references
    batch delivery
    0 references
    make-to-order production
    0 references
    branch and bound
    0 references
    metaheuristics
    0 references
    0 references
    0 references
    0 references