Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates (Q2066679): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10951-021-00697-4 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3184810401 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An FPTAS for a single-item capacitated economic lot-sizing problem with monotone cost structure / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Bound Algorithm for the Prize-Collecting Single-Machine Scheduling Problem with Deadlines and Total Tardiness Minimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bi-objective model for the single-machine scheduling problem with rejection cost and total tardiness minimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Approximability of Geometric and Geographic Generalization and the Min-Max Bin Covering Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Total Tardiness on One Machine is NP-Hard / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the complexity of generalized due date scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the parameterized tractability of single machine scheduling with rejection / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note: minimizing total absolute deviation of job completion times on unrelated machines with general position-dependent processing times and job-rejection / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling with learning effect and job rejection / rank
 
Normal rank
Property / cites work
 
Property / cites work: Regular scheduling measures on proportionate flowshop with job rejection / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on the SPT heuristic for solving scheduling problems with generalized due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine scheduling with assignable due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for Scheduling Independent Tasks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5091069 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria approach to scheduling a single machine with job rejection and positional penalties / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey on offline scheduling with rejection / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total weighted completion time in a proportionate flow shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3197606 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing maximum absolute lateness and range of lateness under generalized due dates on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-agent single-machine scheduling with assignable due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-machine scheduling under the job rejection constraint / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 18:18, 27 July 2024

scientific article
Language Label Description Also known as
English
Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates
scientific article

    Statements

    Minimizing the total tardiness and job rejection cost in a proportionate flow shop with generalized due dates (English)
    0 references
    0 references
    0 references
    0 references
    14 January 2022
    0 references
    0 references
    0 references
    0 references
    0 references