Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms (Q5139609): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Created claim: Wikidata QID (P12): Q127951635, #quickstatements; #temporary_batch_1722266931810
 
(2 intermediate revisions by 2 users not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1287/ijoc.2018.0842 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2942919360 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing customer order lead-time in a two-stage assembly supply chain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling on identical machines: How good is LPT in an on-line setting? / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Production and Outbound Distribution Scheduling: Review and Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Order Assignment and Scheduling in a Supply Chain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Scheduling of Production and Distribution Operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online integrated production-distribution scheduling problems without preemption / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply Chain Scheduling: Batching and Delivery / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: minimizing the makespan and delivery cost / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal on-line algorithms for single-machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Best Possible Deterministic On-Line Algorithm for Minimizing Maximum Delivery Time on a Single Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with transportation considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4124328 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Order scheduling in an environment with dedicated resources in parallel / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with deliveries to multiple customer locations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using genetic algorithms for the coordinated scheduling problem of a batching machine and two-stage transportation / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimal online algorithm for single machine scheduling with bounded delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line scheduling of parallel machines to minimize total completion times / rank
 
Normal rank
Property / cites work
 
Property / cites work: A class of on-line scheduling algorithms to minimize total completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3525911 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Efficient Algorithms for Average Completion Time Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Distribution Coordination Between Suppliers and Customers with a Consolidation Center / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid two-stage transportation and batch scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Charge Batching and Casting Width Selection at Baosteel / rank
 
Normal rank
Property / cites work
 
Property / cites work: An improved on-line algorithm for single parallel-batch machine scheduling with delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated machine scheduling and vehicle routing with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling with supply and delivery considerations to minimize the makespan / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q127951635 / rank
 
Normal rank

Latest revision as of 16:43, 29 July 2024

scientific article; zbMATH DE number 7283438
Language Label Description Also known as
English
Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
scientific article; zbMATH DE number 7283438

    Statements

    Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms (English)
    0 references
    9 December 2020
    0 references
    make-to-order
    0 references
    scheduling
    0 references
    delivery
    0 references
    dynamic programming
    0 references
    heuristic
    0 references
    online algorithm
    0 references
    worst-case analysis
    0 references
    asymptotic analysis
    0 references
    competitive ratio analysis
    0 references
    0 references
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references