A best possible algorithm for an online scheduling problem with deteriorating effect in steel box girder section production (Q2691495): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Changed an Item
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.3934/jimo.2022202 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W4312422689 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated optimization of material supplying, manufacturing, and product distribution: models and fast algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise survey of scheduling with time-dependent processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online batch scheduling on parallel machines with delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Energy efficient scheduling of parallelizable jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review of four decades of time-dependent scheduling: main results, new topics, and open problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Best Possible Deterministic On-Line Algorithm for Minimizing Maximum Delivery Time on a Single Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4242389 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online unbounded batch scheduling on parallel machines with delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online scheduling on two parallel machines with release dates and delivery times / rank
 
Normal rank
Property / cites work
 
Property / cites work: On scheduling a deteriorating rate-modifying activity to minimize the number of tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online scheduling with linear deteriorating jobs to minimize the total weighted completion time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Online over time scheduling on parallel-batch machines: a survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling jobs under decreasing linear deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: A best on-line algorithm for the single machine parallel-batch scheduling with restricted delivery times / rank
 
Normal rank

Latest revision as of 20:08, 31 July 2024

scientific article
Language Label Description Also known as
English
A best possible algorithm for an online scheduling problem with deteriorating effect in steel box girder section production
scientific article

    Statements

    A best possible algorithm for an online scheduling problem with deteriorating effect in steel box girder section production (English)
    0 references
    0 references
    0 references
    0 references
    29 March 2023
    0 references
    scheduling
    0 references
    online algorithm
    0 references
    delivery time
    0 references
    deteriorating effect
    0 references
    section of steel box girder
    0 references

    Identifiers