A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness (Q6164626): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2023.106245 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W4366572576 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lexicographic quasiconcave multiobjective programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Partially observed Markov decision processes with binomial observations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lexicographic multi-objective linear programming using grossone methodology: theory and algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rational choice and economic behavior / rank
 
Normal rank
Property / cites work
 
Property / cites work: Robust single machine scheduling with a flexible maintenance activity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel machine scheduling with completion-time-based criteria and sequence-dependent deterioration / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria parallel machine scheduling with a learning effect of setup and removal times / rank
 
Normal rank
Property / cites work
 
Property / cites work: New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Axioms for Lexicographic Preferences / rank
 
Normal rank
Property / cites work
 
Property / cites work: A further study on two-agent parallel-batch scheduling with release dates and deteriorating jobs to minimize the makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Time-dependent scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling parallel CNC machines with time/cost trade-off considerations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Linear lexicographic optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Convergence of Stochastic Iterative Dynamic Programming Algorithms / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Model parameter estimation and residual life prediction for a partially observable failing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bi-objective short-term scheduling in a rolling horizon framework: a priori approaches with alternative operational objectives / rank
 
Normal rank
Property / cites work
 
Property / cites work: A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production and replacement policies for a deteriorating manufacturing system under random demand and quality / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lexicographical problems of linear programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-price algorithm for scheduling of deteriorating jobs and flexible periodic maintenance on a single machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: \({\mathcal Q}\)-learning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved estimation of distribution algorithm for the problem of single-machine scheduling with deteriorating jobs and different due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bi-objective parallel machine scheduling with additional resources during setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hidden semi-Markov models / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook / rank
 
Normal rank
Property / cites work
 
Property / cites work: A general variable neighborhood search algorithm for a parallel-machine scheduling problem considering machine health conditions and preventive maintenance / rank
 
Normal rank

Latest revision as of 14:11, 1 August 2024

scientific article; zbMATH DE number 7706747
Language Label Description Also known as
English
A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness
scientific article; zbMATH DE number 7706747

    Statements

    A lexicographic optimization approach for a bi-objective parallel-machine scheduling problem minimizing total quality loss and total tardiness (English)
    0 references
    0 references
    0 references
    0 references
    4 July 2023
    0 references
    parallel-machine scheduling
    0 references
    lexicographic optimization
    0 references
    maintenance
    0 references
    quality loss
    0 references
    total tardiness
    0 references

    Identifiers