Bicriteria scheduling on a series-batching machine to minimize maximum cost and makespan (Q300969): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(7 intermediate revisions by 7 users not shown)
Property / DOI
 
Property / DOI: 10.1007/s10100-011-0220-9 / rank
Normal rank
 
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90B35 / rank
 
Normal rank
Property / Mathematics Subject Classification ID
 
Property / Mathematics Subject Classification ID: 90C60 / rank
 
Normal rank
Property / zbMATH DE Number
 
Property / zbMATH DE Number: 6599397 / rank
 
Normal rank
Property / zbMATH Keywords
 
multicriteria scheduling
Property / zbMATH Keywords: multicriteria scheduling / rank
 
Normal rank
Property / zbMATH Keywords
 
batching machine
Property / zbMATH Keywords: batching machine / rank
 
Normal rank
Property / zbMATH Keywords
 
maximum lateness
Property / zbMATH Keywords: maximum lateness / rank
 
Normal rank
Property / zbMATH Keywords
 
Pareto optimal solutions
Property / zbMATH Keywords: Pareto optimal solutions / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: Publication / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10100-011-0220-9 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2078058343 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Problems with Two Competing Agents / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multiple-criterion model for machine scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q2734595 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey / rank
 
Normal rank
Property / cites work
 
Property / cites work: Bicriteria scheduling on a batching machine to minimize maximum lateness and makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3070927 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A DP algorithm for minimizing makespan and total completion time on a series-batching machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multicriteria scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-Machine Scheduling to Minimize a Function of Two or Three Maximum Cost Criteria / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total completion time and maximum cost simultaneously is solvable in polynomial time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling Groups of Jobs on a Single Machine / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1007/S10100-011-0220-9 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 13:51, 9 December 2024

scientific article
Language Label Description Also known as
English
Bicriteria scheduling on a series-batching machine to minimize maximum cost and makespan
scientific article

    Statements

    Identifiers