A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process (Q319506): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q2473276
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2015.02.026 / rank
Normal rank
 
Property / author
 
Property / author: Jing-Hua Hao / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2015.02.026 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2028298424 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel hybrid algorithm for scheduling steel-making continuous casting production / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage, Hybrid Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process / rank
 
Normal rank
Property / cites work
 
Property / cites work: A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of dynamic scheduling in manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parameter selection and adaptation in Unified Particle Swarm Optimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex / rank
 
Normal rank
Property / cites work
 
Property / cites work: A mathematical programming model for scheduling steelmaking-continuous casting production / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review of planning and scheduling systems and methods for integrated steel production / rank
 
Normal rank
Property / cites work
 
Property / cites work: Steel-making process scheduling using Lagrangian relaxation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated Charge Batching and Casting Width Selection at Baosteel / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling a hybrid flowshop with batch production at the last stage / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2015.02.026 / rank
 
Normal rank

Latest revision as of 14:13, 9 December 2024

scientific article
Language Label Description Also known as
English
A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process
scientific article

    Statements

    A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    6 October 2016
    0 references
    steelmaking
    0 references
    continuous casting
    0 references
    uncertainty
    0 references
    scheduling
    0 references
    soft decision
    0 references

    Identifiers