An exact approach based on a new pseudo-polynomial network flow model for integrated planning and scheduling (Q342571): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Normalize DOI.
 
(8 intermediate revisions by 6 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2016.07.008 / rank
Normal rank
 
Property / author
 
Property / author: José M. Valério de Carvalho / rank
Normal rank
 
Property / author
 
Property / author: Q590688 / rank
Normal rank
 
Property / author
 
Property / author: José M. Valério de Carvalho / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2016.07.008 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2462669918 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A stabilized branch-and-price-and-cut algorithm for the multiple length cutting stock problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A zero-inventory production and distribution problem with a fixed customer sequence / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut-and-price algorithm for one-dimensional stock cutting and two-dimensional two-stage cutting / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new LP-based lower bound for the cumulative scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with job delivery coordination / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3002852 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A mixed integer linear programming approach to minimize the number of late jobs with and without machine availability constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Challenges in Enterprise Wide Optimization for the Process Industries / rank
 
Normal rank
Property / cites work
 
Property / cites work: A cutting plane approach for integrated planning and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integer Programming and Constraint Programming in Solving a Multimachine Assignment Scheduling Problem with Deadlines and Release Dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cutting and packing optimization. Problems modeling and solution methods. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exact solution of bin-packing problems using column generation and branch-and-bound / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with an availability constraint and job delivery coordination / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2016.07.008 / rank
 
Normal rank

Latest revision as of 14:55, 9 December 2024

scientific article
Language Label Description Also known as
English
An exact approach based on a new pseudo-polynomial network flow model for integrated planning and scheduling
scientific article

    Statements

    An exact approach based on a new pseudo-polynomial network flow model for integrated planning and scheduling (English)
    0 references
    0 references
    0 references
    0 references
    17 November 2016
    0 references
    production planning and scheduling
    0 references
    integer linear programming
    0 references
    network flow models
    0 references

    Identifiers

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references