A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry (Q342399): Difference between revisions

From MaRDI portal
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
(7 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2016.03.002 / rank
Normal rank
 
Property / author
 
Property / author: Jing-Hua Hao / rank
Normal rank
 
Property / author
 
Property / author: Jing-Hua Hao / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2016.03.002 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2295319872 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review of planning and scheduling systems and methods for integrated steel production / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production planning and order acceptance under uncertainty: a robust optimization approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integration of continuous caster and hot strip mill planning for steel production / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple objective linear programming models with interval coefficients -- an illustrated overview / rank
 
Normal rank
Property / cites work
 
Property / cites work: \(L\)-class enumeration algorithms for a discrete production planning problem with interval resource quantities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Interval robust multi-objective algorithm / rank
 
Normal rank
Property / cites work
 
Property / cites work: Survey of multi-objective optimization methods for engineering / rank
 
Normal rank
Property / cites work
 
Property / cites work: SMS-EMOA: multiobjective selection based on dominated hypervolume / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4680350 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2016.03.002 / rank
 
Normal rank

Latest revision as of 14:55, 9 December 2024

scientific article
Language Label Description Also known as
English
A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry
scientific article

    Statements

    A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    17 November 2016
    0 references
    steelmaking-continuous casting-hot rolling
    0 references
    integrated production planning
    0 references
    interval number
    0 references
    uncertainty modeling
    0 references
    evolutionary multi-objective optimization
    0 references

    Identifiers