Control methods for dynamic time-based manufacturing under customized product lead times (Q439459): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Changed an Item
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2011.10.014 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2011.10.014 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1972900968 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling of flexible flow lines in an automobile assembly plant / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple machine JIT scheduling: a tabu search approach / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for hybrid flow shops with controllable processing times and assignable due dates / rank
 
Normal rank
Property / cites work
 
Property / cites work: A review of exact solution methods for the non-preemptive multiprocessor flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling flexible flow lines with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flexible flow shop scheduling with uniform parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Real-time due-date promising by build-to-order environments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Conceptual framework for lot-sizing and scheduling of flexible flow lines / rank
 
Normal rank
Property / cites work
 
Property / cites work: The hybrid flow shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Due date assignment using artificial neural networks under different shop floor control strategies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lead Time Policies / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2011.10.014 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 17:38, 9 December 2024

scientific article
Language Label Description Also known as
English
Control methods for dynamic time-based manufacturing under customized product lead times
scientific article

    Statements

    Control methods for dynamic time-based manufacturing under customized product lead times (English)
    0 references
    0 references
    0 references
    16 August 2012
    0 references
    time-based manufacturing
    0 references
    hybrid flow shop
    0 references
    dynamic scheduling
    0 references
    customer order flexibility
    0 references
    distributed control
    0 references

    Identifiers