A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop (Q477611): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
(One intermediate revision by one other user not shown) | |||
Property / DOI | |||
Property / DOI: 10.1016/j.ipl.2014.09.004 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.IPL.2014.09.004 / rank | |||
Normal rank |
Latest revision as of 18:41, 9 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop |
scientific article |
Statements
A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshop (English)
0 references
9 December 2014
0 references
scheduling
0 references
proportionate flowshop
0 references
just-in-time
0 references
0 references
0 references
0 references
0 references