A job-shop scheduling approach for optimising sugarcane rail operations (Q656056): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1007/s10696-011-9092-5 / rank
Normal rank
 
Property / describes a project that uses
 
Property / describes a project that uses: OPL / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10696-011-9092-5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2093137579 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch and bound algorithm for scheduling trains in a railway network / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid approach to scheduling with earliness and tardiness costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A sequencing approach for creating new train timetables / rank
 
Normal rank
Property / cites work
 
Property / cites work: A disjunctive graph model and framework for constructing new train schedules / rank
 
Normal rank
Property / cites work
 
Property / cites work: An empirical study of constraint logic programming and answer set programming solutions of combinatorial problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated production and material handling scheduling using mathematical programming and constraint programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mathematical solutions for solving periodic railway transportation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint and Integer Programming in OPL / rank
 
Normal rank
Property / cites work
 
Property / cites work: An external-memory depth-first search algorithm for general grid graphs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modelling the number and location of sidings on a single line railway / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid method for the planning and scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling trains as a blocking parallel-machine job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Cane railway scheduling via constraint logic programming: Labelling order and constraints in a real-life application / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job-shop scheduling with blocking and no-wait constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid heuristic to solve the parallel machines job-shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Hybrid Constraint Programming / Local Search Approach to the Job-Shop Scheduling Problem / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1007/S10696-011-9092-5 / rank
 
Normal rank

Latest revision as of 00:01, 10 December 2024

scientific article
Language Label Description Also known as
English
A job-shop scheduling approach for optimising sugarcane rail operations
scientific article

    Statements

    A job-shop scheduling approach for optimising sugarcane rail operations (English)
    0 references
    0 references
    0 references
    0 references
    26 January 2012
    0 references
    integer programming
    0 references
    constraint programming
    0 references
    sugarcane rail
    0 references
    job shop
    0 references

    Identifiers