A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (Q869149): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Normalize DOI.
 
(4 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2005.06.069 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2005.06.069 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1981187536 / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q57185847 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Savings Index Heuristic Algorithm for Flowshop Scheduling with Sequence Dependent Set-up Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Impact of sequence-dependent setup time on job shop scheduling performance / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3212909 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job shop scheduling with group-dependent setups, finite buffers, and long time horizon / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling in a sequence dependent setup environment with genetic search / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic / rank
 
Normal rank
Property / cites work
 
Property / cites work: Construction heuristics for the asymmetric TSP. / rank
 
Normal rank
Property / DBLP publication ID
 
Property / DBLP publication ID: journals/eor/LuoC07 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2005.06.069 / rank
 
Normal rank

Latest revision as of 06:10, 10 December 2024

scientific article
Language Label Description Also known as
English
A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness
scientific article

    Statements

    A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness (English)
    0 references
    0 references
    0 references
    26 February 2007
    0 references
    combinatorial optimization
    0 references
    maximum tardiness
    0 references
    sequence-dependent setup
    0 references
    branch and bound
    0 references
    single machine schedule
    0 references

    Identifiers