Flowshop scheduling problem with parallel semi-lines and final synchronization operation (Q2003426): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Import241208061232 (talk | contribs)
Normalize DOI.
 
(5 intermediate revisions by 5 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.cor.2019.04.011 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2019.04.011 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2936713194 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling two-stage hybrid flow shop with availability constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures / rank
 
Normal rank
Property / cites work
 
Property / cites work: MIP Formulations for Flowshop Scheduling with Limited Buffers / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Complexity of Flowshop and Jobshop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling research after five decades / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: New heuristics for total tardiness minimization in a flexible flowshop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Mixed-Integer Programming Models for Flowshop Scheduling Problems Minimizing the Total Earliness and Tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The distributed permutation flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two MILP models for the N × M SDST flowshop sequencing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new heuristic method for the flow shop sequencing problem / rank
 
Normal rank
Property / Wikidata QID
 
Property / Wikidata QID: Q128062647 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.COR.2019.04.011 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 17:47, 16 December 2024

scientific article
Language Label Description Also known as
English
Flowshop scheduling problem with parallel semi-lines and final synchronization operation
scientific article

    Statements

    Flowshop scheduling problem with parallel semi-lines and final synchronization operation (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    8 July 2019
    0 references
    flowshop scheduling
    0 references
    synchronization operation
    0 references
    heuristic and metaheuristic methods
    0 references
    GRASP algorithm
    0 references
    simulated annealing algorithm
    0 references

    Identifiers