Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (Q2378452): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2007.12.042 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1979725161 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A survey of scheduling problems with setup times or costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Towards the integration of flexible manufacturing system scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recircu\-lation / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new paradigm for rule-based scheduling in the wafer probe centre / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic local search algorithm for minimizing total weighted tardiness in the job-shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A memetic algorithm for the total tardiness single machine scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A hybrid genetic algorithm for the job shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: New dispatching rules for shop scheduling: A step forward / rank
 
Normal rank
Property / cites work
 
Property / cites work: A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new rule for minimizing the number of tardy jobs in dynamic flow shops / rank
 
Normal rank
Property / cites work
 
Property / cites work: An efficient genetic algorithm for job shop scheduling with tardiness objectives. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic algorithms to minimize the weighted number of late jobs on a single machine. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Benchmarks for basic scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Adaptive memory programming: a unified view of metaheuristics / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithms simulation approach for the multi-attribute combinatorial dispatching decision problem / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2007.12.042 / rank
 
Normal rank

Latest revision as of 07:11, 18 December 2024

scientific article
Language Label Description Also known as
English
Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times
scientific article

    Statements

    Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times (English)
    0 references
    0 references
    0 references
    8 January 2009
    0 references
    scheduling
    0 references
    job shop
    0 references
    sequence dependent setup
    0 references
    dispatching rules
    0 references
    genetic algorithms
    0 references

    Identifiers