Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation (Q2470273): Difference between revisions
From MaRDI portal
ReferenceBot (talk | contribs) Changed an Item |
Normalize DOI. |
||
Property / DOI | |||
Property / DOI: 10.1016/j.apm.2006.08.022 / rank | |||
Property / DOI | |||
Property / DOI: 10.1016/J.APM.2006.08.022 / rank | |||
Normal rank |
Latest revision as of 20:19, 18 December 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation |
scientific article |
Statements
Analysis of the manufacturing lead time in a production system with non-renewal batch input, threshold policy and post-operation (English)
0 references
14 February 2008
0 references
non-renewal input
0 references
\(N\)-policy
0 references
waiting time
0 references
0 references