A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem (Q2892296): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(One intermediate revision by one other user not shown)
Property / DOI
 
Property / DOI: 10.1287/ijoc.1040.0121 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1287/ijoc.1040.0121 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2117837254 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1287/IJOC.1040.0121 / rank
 
Normal rank

Latest revision as of 03:38, 20 December 2024

scientific article
Language Label Description Also known as
English
A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem
scientific article

    Statements

    A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem (English)
    0 references
    0 references
    0 references
    0 references
    18 June 2012
    0 references
    project scheduling
    0 references
    multiple resources
    0 references
    integer linear programming
    0 references
    branch and cut
    0 references

    Identifiers