Pre-auction lane selection in an integrated production–distribution planning problem (Q6094433): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1080/0305215x.2020.1833875 / rank
Normal rank
 
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/0305215x.2020.1833875 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W3106055291 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Continuous-time production, distribution and financial planning with periodic liquidity balancing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid genetic algorithm for the open capacitated arc routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The vehicle routing problem with occasional drivers / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated shipment dispatching and packing problems: a case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: A multi-stage supply chain network design problem with in-house production and partial product outsourcing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling the Pre Auction Stage The Truckload Case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Managerial and economic impacts of reducing delivery variance in the supply chain / rank
 
Normal rank
Property / cites work
 
Property / cites work: Decomposition techniques with mixed integer programming and heuristics for home healthcare planning / rank
 
Normal rank
Property / cites work
 
Property / cites work: Machine scheduling with an availability constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: The two-echelon production-routing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling in a two-stage supply chain with uncertain parameters / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Location-based techniques for the synergy approximation in combinatorial transportation auctions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimisation techniques for planning the petrol replenishment to retail stations over a multi-period horizon / rank
 
Normal rank
Property / cites work
 
Property / cites work: The stochastic bid generation problem in combinatorial transportation auctions / rank
 
Normal rank
Property / cites work
 
Property / cites work: A concise guide to existing and emerging vehicle routing problem variants / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1080/0305215X.2020.1833875 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 18:23, 30 December 2024

scientific article; zbMATH DE number 7747757
Language Label Description Also known as
English
Pre-auction lane selection in an integrated production–distribution planning problem
scientific article; zbMATH DE number 7747757

    Statements

    Pre-auction lane selection in an integrated production–distribution planning problem (English)
    0 references
    0 references
    0 references
    0 references
    10 October 2023
    0 references
    shipper lane selection problem
    0 references
    occasional drivers
    0 references
    integrated production-distribution planning
    0 references

    Identifiers