Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum (Q732896): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Eun Kyung Park / rank
Normal rank
 
Property / author
 
Property / author: Eun Kyung Park / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2009.05.007 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2076538930 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single machine multi-product capacitated lot sizing with sequence-dependent setups / rank
 
Normal rank
Property / cites work
 
Property / cites work: Single item lot-sizing problem for a warm/cold process with immediate lost sales / rank
 
Normal rank
Property / cites work
 
Property / cites work: Rolling-horizon lot-sizing when set-up times are sequence-dependent / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequential-analysis Based Randomized-regret-methods for Lot-sizing and Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A modified framework for modelling set-up carryover in the capacitated lotsizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: The general lotsizing and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous lotsizing and scheduling by combining local search with dual reoptimization / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous lotsizing and scheduling on parallel machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiperiod production planning carrying over set-up time / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Capacitated Lot-Sizing Problem with Linked Lot Sizes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling of period overlapping setup times / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 02:02, 2 July 2024

scientific article
Language Label Description Also known as
English
Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum
scientific article

    Statements

    Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    15 October 2009
    0 references
    0 references
    0 references
    0 references
    0 references
    production system
    0 references
    lot-sizing and scheduling
    0 references
    heuristic
    0 references
    0 references