A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement (Q900590): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: CPLEX / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s13369-014-1319-9 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2069967121 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project Scheduling Under Partially Renewable Resource Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Cut Procedure for the Vehicle Routing Problem with Time Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A branch-and-cut algorithm for scheduling of projects with variable-intensity activities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling: Notation, classification, models, and methods / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some efficient multi-heuristic procedures for resource-constrained project scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A simulated annealing algorithm for resource constrained project scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Facets of the knapsack polytope / rank
 
Normal rank
Property / cites work
 
Property / cites work: Project scheduling. A research handbook. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Allocation of partially renewable resources: Concept, capabilities, and applications / rank
 
Normal rank
Property / cites work
 
Property / cites work: A scatter search algorithm for project scheduling under partially renewable resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: GRASP and path relinking for project scheduling under partially renewable resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Algorithm for Solving the Job-Shop Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Facet of regular 0–1 polytopes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Faces for a linear inequality in 0–1 variables / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Large-Scale Zero-One Linear Programming Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Surrogate Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Multiphase-Dual Algorithm for the Zero-One Integer Programming Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Generating cuts from surrogate constraint analysis for zero-one and multiple choice programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Min-max optimization of several classical discrete optimization problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Additive Algorithm for Solving Linear Programs with Zero-One Variables / rank
 
Normal rank

Latest revision as of 06:29, 11 July 2024

scientific article
Language Label Description Also known as
English
A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement
scientific article

    Statements

    A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement (English)
    0 references
    22 December 2015
    0 references
    0 references
    0 references
    0 references
    0 references
    project scheduling
    0 references
    resource constraints
    0 references
    nonrenewable resources with prescheduled procurement
    0 references
    branch and cut
    0 references
    0 references
    0 references