A heuristic approach for big bucket multi-level production planning problems (Q958084): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Import241208061232 (talk | contribs)
Normalize DOI.
 
(9 intermediate revisions by 4 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2007.11.033 / rank
Normal rank
 
Property / describes a project that uses
 
Property / describes a project that uses: MULTILSB / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: FEASPUMP / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: XPRESS / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: Mosel / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: bc-prod / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: Octane / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2026582326 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot-Sizing Algorithms for Complex Product Structures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Improved Algorithms for Economic Lot Size Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A study of the lot-sizing polytope / rank
 
Normal rank
Property / cites work
 
Property / cites work: Octane: A New Heuristic for Pure 0–1 Programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Strong Formulations for Multi-Item Capacitated Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Uncapacitated lot-sizing: The convex hull of solutions / rank
 
Normal rank
Property / cites work
 
Property / cites work: bc — prod: A Specialized Branch-and-Cut System for Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs / rank
 
Normal rank
Property / cites work
 
Property / cites work: A cutting plane approach to capacitated lot-sizing with start-up costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Exploring relaxation induced neighborhoods to improve MIP solutions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Capacitated Lot-Sizing Problems Using Variable Redefinition / rank
 
Normal rank
Property / cites work
 
Property / cites work: Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0(n log n) or 0(n) Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: The feasibility pump / rank
 
Normal rank
Property / cites work
 
Property / cites work: Local branching / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic Production Planning with Concave Costs and Capacity Constraints / rank
 
Normal rank
Property / cites work
 
Property / cites work: Deterministic Production Planning: Algorithms and Complexity / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4139966 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The uncapacitated lot-sizing problem with sales and safety stocks / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the polyhedral structure of a multi-item production planning model with setup times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot-size models with backlogging: Strong reformulations and cutting planes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes / rank
 
Normal rank
Property / cites work
 
Property / cites work: Polyhedra for lot-sizing with Wagner-Whitin costs / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production Planning by Mixed Integer Programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Valid inequalities and projecting the multicommodity extended formulation for uncapacitated fixed charge network flow problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling multiple stage manufacturing systems with generalized costs and capacity issues / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: An <i>O</i>(<i>T</i><sup>3</sup>) Algorithm for the Economic Lot-Sizing Problem with Constant Capacities / rank
 
Normal rank
Property / cites work
 
Property / cites work: A General Heuristic for Production Planning Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Approximate extended formulations / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dynamic Version of the Economic Lot Size Model / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving Multi-Item Lot-Sizing Problems with an MIP Solver Using Classification and Reformulation / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2007.11.033 / rank
 
Normal rank

Latest revision as of 09:58, 10 December 2024

scientific article
Language Label Description Also known as
English
A heuristic approach for big bucket multi-level production planning problems
scientific article

    Statements

    A heuristic approach for big bucket multi-level production planning problems (English)
    0 references
    0 references
    0 references
    2 December 2008
    0 references
    integer programming
    0 references
    production planning
    0 references
    heuristics
    0 references
    relax-and-fix
    0 references
    strong formulations
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references

    Identifiers