Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm (Q1042216): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
Normalize DOI.
 
(5 intermediate revisions by 4 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2007.11.066 / rank
Normal rank
 
Property / author
 
Property / author: Alexandre Dolgui / rank
Normal rank
 
Property / author
 
Property / author: Alexandre Dolgui / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2007.11.066 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1963755332 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Random lead times and expedited orders in \((Q,r)\) inventory systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The application of valid inequalities to the multi-stage lot-sizing problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Heuristic for a Resource-capacitated Multi-stage Lot-sizing Problem with Lead Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Supply management in assembly systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: An optimal \((Q,r)\) policy for a multipart assembly system under stochastic part procurement lead times / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Inventory Model with Order Crossover / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Dynamic Inventory Model with Stochastic Lead Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Safety stock reduction by order splitting / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3995531 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—The EOQ Model under Stochastic Lead Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Generalized newsboy model to compute the optimal planned lead times in assembly systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Near Myopic Heuristics for the Fixed-Life Perishability Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Pricing and the Newsvendor Problem: A Review with Extensions / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3971990 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Stochastic Non-sequential Production-planning Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Stock Control with Two Suppliers and Normal Lead Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q5358751 / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2007.11.066 / rank
 
Normal rank

Latest revision as of 14:36, 10 December 2024

scientific article
Language Label Description Also known as
English
Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm
scientific article

    Statements

    Calculating safety stocks for assembly systems with random component procurement lead times: a branch and bound algorithm (English)
    0 references
    0 references
    0 references
    7 December 2009
    0 references
    supply chain management
    0 references
    inventory
    0 references
    uncertainty modelling
    0 references
    combinatorial optimization
    0 references
    branch and bound
    0 references

    Identifiers