Fast approach to the optimal production/PM policy (Q1591960): Difference between revisions
From MaRDI portal
Added link to MaRDI item. |
ReferenceBot (talk | contribs) Changed an Item |
||
(One intermediate revision by one other user not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Optimal Preventive Maintenance Policies for Repairable Systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions / rank | |||
Normal rank |
Latest revision as of 11:15, 3 June 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Fast approach to the optimal production/PM policy |
scientific article |
Statements
Fast approach to the optimal production/PM policy (English)
0 references
14 January 2001
0 references
inventory
0 references
production systems
0 references
economical manufacturing quality
0 references
preventive maintenance
0 references
imperfect process
0 references
optimal inspection interval
0 references
0 references