A modified priority index for Günther's lot-sizing heuristic under capacited single stage production (Q1119459): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Willem J. Selen / rank
Normal rank
 
Property / author
 
Property / author: R. M. J. Heuts / rank
Normal rank
 
Property / author
 
Property / author: Willem J. Selen / rank
 
Normal rank
Property / author
 
Property / author: R. M. J. Heuts / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0377-2217(89)90382-2 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2009189995 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Planning lot sizes and capacity requirements in a single stage production system / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 14:11, 19 June 2024

scientific article
Language Label Description Also known as
English
A modified priority index for Günther's lot-sizing heuristic under capacited single stage production
scientific article

    Statements

    A modified priority index for Günther's lot-sizing heuristic under capacited single stage production (English)
    0 references
    1989
    0 references
    lot-sizing heuristic
    0 references
    capacited single stage production
    0 references
    computational efficiency
    0 references
    0 references
    0 references

    Identifiers