Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time (Q2378748): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.amc.2008.05.086 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2037597655 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4658190 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3938812 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3751359 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job sequencing with fuzzy processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling under fuzziness / rank
 
Normal rank
Property / cites work
 
Property / cites work: Real-time task scheduling with fuzzy deadlines and processing times / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4667334 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A similar particle swarm optimization algorithm for job-shop scheduling to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: A similar particle swarm optimization algorithm for permutation flowshop scheduling to minimize makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: Fuzzy sets / rank
 
Normal rank
Property / cites work
 
Property / cites work: A procedure for ordering fuzzy subsets of the unit interval / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ranking fuzzy numbers in the setting of possibility theory / rank
 
Normal rank
Property / cites work
 
Property / cites work: Ranking fuzzy numbers with maximizing set and minimizing set / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparison of fuzzy numbers based on the probability measure of fuzzy events / rank
 
Normal rank
Property / cites work
 
Property / cites work: Outline for a Logical Theory of Adaptive Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Distribution-based adaptive bounding genetic algorithm for continuous optimisation problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Genetic algorithms and traveling salesman problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Shifting Bottleneck Procedure for Job Shop Scheduling / rank
 
Normal rank

Latest revision as of 22:53, 28 June 2024

scientific article
Language Label Description Also known as
English
Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time
scientific article

    Statements

    Particle swarm optimization combined with genetic operators for job shop scheduling problem with fuzzy processing time (English)
    0 references
    0 references
    0 references
    0 references
    14 January 2009
    0 references
    job shop scheduling
    0 references
    makespan
    0 references
    fuzzy sets
    0 references
    processing time
    0 references
    particle swarm optimization (PSO)
    0 references
    genetic algorithm
    0 references

    Identifiers