Integrated production and material handling scheduling using mathematical programming and constraint programming (Q2433554): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(6 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: André Langevin / rank
Normal rank
 
Property / author
 
Property / author: André Langevin / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: CPLEX / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: OR-Library / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2005.02.077 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2046678043 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Shifting Bottleneck Procedure for Job Shop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies / rank
 
Normal rank
Property / cites work
 
Property / cites work: Constraint-based scheduling: Applying constraint programming to scheduling problems. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4523706 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dispatching rail-guided vehicles and scheduling jobs in a flexible manufacturing system / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4254883 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Exact Constraint Logic Programming Algorithm for the Traveling Salesman Problem with Time Windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: The generalized shifting bottleneck procedure / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job shop scheduling considering material handling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles / rank
 
Normal rank

Latest revision as of 21:24, 24 June 2024

scientific article
Language Label Description Also known as
English
Integrated production and material handling scheduling using mathematical programming and constraint programming
scientific article

    Statements

    Integrated production and material handling scheduling using mathematical programming and constraint programming (English)
    0 references
    0 references
    0 references
    0 references
    27 October 2006
    0 references
    scheduling
    0 references
    job shop
    0 references
    material handling
    0 references
    mixed integer programming
    0 references
    constraint programming
    0 references
    0 references
    0 references

    Identifiers