A two-machine flowshop scheduling problem with a separated maintenance constraint (Q2456646): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.cor.2006.04.007 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2069625430 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequency on two and three machines with setup, processing and removal times separated / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3883869 / rank
 
Normal rank
Property / cites work
 
Property / cites work: TWO-AND THREE-MACHINE FLOW-SHOP MAKESPAN SCHEDULING PROBLEMS WITH ADDITIONAL TIMES SEPARATED FROM PROCESSING TIMES / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling in stochastic flowshops with independent setup, processing and removal times / rank
 
Normal rank

Latest revision as of 10:21, 27 June 2024

scientific article
Language Label Description Also known as
English
A two-machine flowshop scheduling problem with a separated maintenance constraint
scientific article

    Statements

    Identifiers