A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods (Q1374387): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(3 intermediate revisions by 3 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: Mlclsp / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal resource leveling using non-serial dynamic programming / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4859840 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical production planning in a make-to-order company: a case study / rank
 
Normal rank
Property / cites work
 
Property / cites work: Integration of lotsizing and scheduling decisions in a job-shop / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Resource Availability Costs in Time-Limited Project Networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analytical Evaluation of Hierarchical Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search for the job-shop scheduling problem with multi-purpose machines / rank
 
Normal rank
Property / cites work
 
Property / cites work: Lot Sizes, Lead Times and In-Process Inventories / rank
 
Normal rank
Property / cites work
 
Property / cites work: Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production scheduling and sequencing for multi-stage production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Integrated Model for Job-Shop Planning and Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multiple resource leveling in construction systems through variation of activity intensities / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4693179 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Elemente einer Theorie hierarchischer Planung / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical structures in organizations: A conceptual framework / rank
 
Normal rank
Property / cites work
 
Property / cites work: A decomposition approach for a resource constrained scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-constrained project scheduling. Exact methods for the multi-mode case / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-level multi-item lot size planning with limited resources and general manufacturing structure. / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for dynamic multi-item multi-level capacitated lotsizing for general product structures / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 09:48, 28 May 2024

scientific article
Language Label Description Also known as
English
A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods
scientific article

    Statements

    A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    8 June 1998
    0 references
    0 references
    hierarchical planning with feedback
    0 references
    make-to-order production
    0 references
    resource-constrained project scheduling
    0 references
    0 references
    0 references