No-wait flowshops with bicriteria of makespan and maximum lateness. (Q1410329): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Tariq A. Aldowaisan / rank
Normal rank
 
Property / author
 
Property / author: Tariq A. Aldowaisan / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solutions to the Constrained Flowshop Sequencing Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3970631 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process / rank
 
Normal rank
Property / cites work
 
Property / cites work: Minimizing total tardiness in permutation flowshops / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A combined branch-and bound and genetic algorithm based approach for a flowshop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A No-Wait Flowshop Scheduling Heuristic to Minimize Makespan / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Flow-Shop Sequencing Problem with No Wait in Process<sup>†</sup> / rank
 
Normal rank
Property / cites work
 
Property / cites work: Some new results in flow shop scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A bicriteria two-machine permutation flowshop problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution of the Flowshop-Scheduling Problem with No Intermediate Queues / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new branch-and-bound approach for the \(n/2\)/flowshop/\(\alpha F+\beta C_{\text{max}}\) flowshop scheduling problem / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/s0377-2217(02)00646-x / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1966577583 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 08:28, 30 July 2024

scientific article
Language Label Description Also known as
English
No-wait flowshops with bicriteria of makespan and maximum lateness.
scientific article

    Statements

    No-wait flowshops with bicriteria of makespan and maximum lateness. (English)
    0 references
    0 references
    0 references
    14 October 2003
    0 references
    No-wait flowshop
    0 references
    Makespan
    0 references
    Maximum lateness
    0 references
    Bicriteria
    0 references
    Heuristics
    0 references

    Identifiers