A novel model for a manufacturing system with joint production lines in terms of prior-set (Q5265608): Difference between revisions

From MaRDI portal
Added link to MaRDI item.
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1080/00207721.2013.783947 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1996626473 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimizing a production system with rework and equal sized batch shipments / rank
 
Normal rank
Property / cites work
 
Property / cites work: Reliability Bounds for Multistate Systems with Multistate Components / rank
 
Normal rank
Property / cites work
 
Property / cites work: Measure the quality level for a supplier-demand system by a multicommodity stochastic-flow network / rank
 
Normal rank
Property / cites work
 
Property / cites work: Reliability evaluation of a multistate network subject to time constraint under routing policy / rank
 
Normal rank
Property / cites work
 
Property / cites work: Maximising profits for an EPQ model with unreliable machine and rework of random defective items / rank
 
Normal rank
Property / cites work
 
Property / cites work: Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Revisiting revenue management for remanufactured products / rank
 
Normal rank

Latest revision as of 13:36, 10 July 2024

scientific article; zbMATH DE number 6466925
Language Label Description Also known as
English
A novel model for a manufacturing system with joint production lines in terms of prior-set
scientific article; zbMATH DE number 6466925

    Statements

    Identifiers