Vehicle scheduling in two-cycle flexible manufacturing systems (Q1341395): Difference between revisions
From MaRDI portal
Changed an Item |
ReferenceBot (talk | contribs) Changed an Item |
||
(2 intermediate revisions by 2 users not shown) | |||
Property / MaRDI profile type | |||
Property / MaRDI profile type: MaRDI publication profile / rank | |||
Normal rank | |||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1016/0895-7177(94)90203-8 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2151157535 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Scheduling methods for a class of flexible manufacturing systems / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: Q4023677 / rank | |||
Normal rank | |||
Property / cites work | |||
Property / cites work: A Fast Algorithm for Multiprocessor Scheduling of Unit-Length Jobs / rank | |||
Normal rank |
Latest revision as of 10:07, 23 May 2024
scientific article
Language | Label | Description | Also known as |
---|---|---|---|
English | Vehicle scheduling in two-cycle flexible manufacturing systems |
scientific article |
Statements
Vehicle scheduling in two-cycle flexible manufacturing systems (English)
0 references
11 January 1995
0 references
flexible manufacturing systems
0 references
production schedules
0 references
routing of automated guided vehicles
0 references