Batch scheduling in a two-machine flow shop with limited buffer (Q674441): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claims
ReferenceBot (talk | contribs)
Changed an Item
 
(2 intermediate revisions by 2 users not shown)
Property / author
 
Property / author: Dario Pacciarelli / rank
 
Normal rank
Property / author
 
Property / author: Fabrizio Rossi / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batch scheduling in a two-machine flow shop with limited buffer / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4872059 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4198056 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal two- and three-stage production schedules with setup times included / rank
 
Normal rank
Property / cites work
 
Property / cites work: Flowshop scheduling with limited temporary storage / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solution of the Flowshop-Scheduling Problem with No Intermediate Queues / rank
 
Normal rank

Latest revision as of 10:35, 27 May 2024

scientific article
Language Label Description Also known as
English
Batch scheduling in a two-machine flow shop with limited buffer
scientific article

    Statements

    Batch scheduling in a two-machine flow shop with limited buffer (English)
    0 references
    0 references
    0 references
    0 references
    5 March 1997
    0 references
    limited buffer
    0 references
    makespan minimization
    0 references
    flow shop
    0 references
    batch processing
    0 references
    polynomial time
    0 references

    Identifiers