An experimental analysis of solution performance in a resource sharing and scheduling problem (Q1776960): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
ReferenceBot (talk | contribs)
Changed an Item
 
(5 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Gadi Rabinowitz / rank
Normal rank
 
Property / author
 
Property / author: Gadi Rabinowitz / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2003.12.020 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2026500181 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hierarchical Production Planning: A Single Stage System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Dimensions of manufacturing automation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Technical Note—Single Machine Scheduling with Controllable Processing Times and Number of Jobs Tardy / rank
 
Normal rank
Property / cites work
 
Property / cites work: Analytical Evaluation of Hierarchical Planning Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4128238 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q3863413 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An Efficient Algorithm for Multi-Item Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: Two level heuristic for the resource constrained scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Control of a production system with variable yield and random demand / rank
 
Normal rank
Property / cites work
 
Property / cites work: Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure / rank
 
Normal rank
Property / cites work
 
Property / cites work: Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case / rank
 
Normal rank
Property / cites work
 
Property / cites work: The optimal design of flexible manufacturing systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Quasi-Static Assembly of Compliantly Supported Rigid Parts / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models of flexible manufacturing systems with limited local buffers / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 11:23, 10 June 2024

scientific article
Language Label Description Also known as
English
An experimental analysis of solution performance in a resource sharing and scheduling problem
scientific article

    Statements

    An experimental analysis of solution performance in a resource sharing and scheduling problem (English)
    0 references
    0 references
    0 references
    0 references
    12 May 2005
    0 references
    0 references
    0 references
    0 references
    0 references
    manufacturing
    0 references
    resource-sharing
    0 references
    production planning
    0 references
    mathematical programming
    0 references
    experimental design
    0 references
    0 references