An improved tabu search approach for solving the job shop scheduling problem with tooling constraints (Q1917279): Difference between revisions

From MaRDI portal
Importer (talk | contribs)
Created a new Item
 
Set OpenAlex properties.
 
(4 intermediate revisions by 4 users not shown)
Property / describes a project that uses
 
Property / describes a project that uses: Tabu search / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Shifting Bottleneck Procedure for Job Shop Scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A tabu search experience in production scheduling / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Branch and Bound Approach for Machine Load Balancing in Flexible Manufacturing Systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Applying tabu search to the job-shop scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu search techniques. A tutorial and an application to neural networks / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4319400 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Future paths for integer programming and links to artificial intelligence / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu Search—Part I / rank
 
Normal rank
Property / cites work
 
Property / cites work: Tabu Search—Part II / rank
 
Normal rank
Property / cites work
 
Property / cites work: A user's guide to tabu search / rank
 
Normal rank
Property / cites work
 
Property / cites work: The tabu search metaheuristic: How we used it / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4365130 / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Fast Taboo Search Algorithm for the Job Shop Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Parallel Taboo Search Techniques for the Job Shop Scheduling Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches / rank
 
Normal rank
Property / cites work
 
Property / cites work: Job Shop Scheduling by Simulated Annealing / rank
 
Normal rank
Property / cites work
 
Property / cites work: A new heuristic method for the flow shop sequencing problem / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0166-218x(95)00040-x / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2024649039 / rank
 
Normal rank
links / mardi / namelinks / mardi / name
 

Latest revision as of 10:35, 30 July 2024

scientific article
Language Label Description Also known as
English
An improved tabu search approach for solving the job shop scheduling problem with tooling constraints
scientific article

    Statements

    An improved tabu search approach for solving the job shop scheduling problem with tooling constraints (English)
    0 references
    0 references
    0 references
    7 July 1996
    0 references
    tabu search
    0 references
    flexible manufacturing systems
    0 references
    heuristic
    0 references
    \(m\)-machine, \(n\)-job shop scheduling
    0 references
    tooling constraints
    0 references

    Identifiers