A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (Q513546): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q1049314
ReferenceBot (talk | contribs)
Changed an Item
 
(4 intermediate revisions by 4 users not shown)
Property / author
 
Property / author: Ali H. Diabat / rank
 
Normal rank
Property / describes a project that uses
 
Property / describes a project that uses: CPLEX / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1007/s10479-016-2239-8 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2409315814 / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Berth Allocation Problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A follow-up survey of berth allocation and quay crane scheduling problems in container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: Determining crane areas for balancing workload among interfering and noninterfering cranes / rank
 
Normal rank
Property / cites work
 
Property / cites work: An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: A note on differential and integral equations in the spaces of functions of \(\Lambda \)-bounded variation / rank
 
Normal rank
Property / cites work
 
Property / cites work: A joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational results / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Lagrangian Relaxation Method for Solving Integer Programming Problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: The crane scheduling problem: models and solution approaches / rank
 
Normal rank
Property / cites work
 
Property / cites work: A crane scheduling method for port container terminals / rank
 
Normal rank
Property / cites work
 
Property / cites work: On double cycling for container port productivity improvement / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simulation-based optimization for discharge/loading operations at a maritime container terminal / rank
 
Normal rank
Property / cites work
 
Property / cites work: A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solving rich quay crane scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Scheduling small number of quay cranes with non-interference constraint / rank
 
Normal rank
Property / cites work
 
Property / cites work: A heuristic for the quay crane scheduling problem based on contiguous bay crane operations / rank
 
Normal rank
Property / cites work
 
Property / cites work: The quay crane scheduling problem with time windows / rank
 
Normal rank
Property / cites work
 
Property / cites work: Container sequencing for quay cranes with internal reshuffles / rank
 
Normal rank
Property / cites work
 
Property / cites work: Hybrid evolutionary computation methods for quay crane scheduling problems / rank
 
Normal rank
Property / cites work
 
Property / cites work: The Dynamic Berth Allocation Problem: A linearized formulation / rank
 
Normal rank
Property / cites work
 
Property / cites work: Modeling and solution of the joint quay crane and truck scheduling problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: On-line scheduling with non-crossing constraints / rank
 
Normal rank

Latest revision as of 12:12, 13 July 2024

scientific article
Language Label Description Also known as
English
A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints
scientific article

    Statements

    A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (English)
    0 references
    0 references
    0 references
    7 March 2017
    0 references
    quay crane scheduling
    0 references
    container terminals
    0 references
    ship stability
    0 references
    Lagrangian relaxation
    0 references
    maritime logistics
    0 references

    Identifiers