Minimizing flow time in a flow-line manufacturing cell with family setup times (Q5200787): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q1383061
Set OpenAlex properties.
 
(2 intermediate revisions by 2 users not shown)
Property / author
 
Property / author: Jeffrey E. Schaller / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1057/palgrave.jors.2601971 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2028078907 / rank
 
Normal rank

Latest revision as of 01:51, 20 March 2024

scientific article; zbMATH DE number 5018324
Language Label Description Also known as
English
Minimizing flow time in a flow-line manufacturing cell with family setup times
scientific article; zbMATH DE number 5018324

    Statements

    Minimizing flow time in a flow-line manufacturing cell with family setup times (English)
    0 references
    0 references
    0 references
    11 April 2006
    0 references
    flowshop scheduling
    0 references
    family setups
    0 references
    lower bounds
    0 references
    heuristic algorithms
    0 references
    manufacturing cells
    0 references
    empirical results
    0 references

    Identifiers