Inspection scheduling for imperfect production processes under free repair warranty contract (Q2370348): Difference between revisions

From MaRDI portal
Changed an Item
Import241208061232 (talk | contribs)
Normalize DOI.
 
(3 intermediate revisions by 3 users not shown)
Property / DOI
 
Property / DOI: 10.1016/j.ejor.2006.09.062 / rank
Normal rank
 
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/j.ejor.2006.09.062 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2025825589 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Production Lot Sizing with Machine Breakdowns / rank
 
Normal rank
Property / cites work
 
Property / cites work: Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4390595 / rank
 
Normal rank
Property / cites work
 
Property / cites work: An EMQ model with inspections and random machine failures / rank
 
Normal rank
Property / cites work
 
Property / cites work: Comparison among Certain Inspection Policies / rank
 
Normal rank
Property / cites work
 
Property / cites work: A Nearly Optimal Inspection Policy / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction / rank
 
Normal rank
Property / cites work
 
Property / cites work: Note—The Impact of Inspection Delay on Process and Inspection Lot Sizing / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4279262 / rank
 
Normal rank
Property / cites work
 
Property / cites work: The impact of a free-repair warranty policy on EMQ model for imperfect production systems / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal lot sizing for products sold under free-repair warranty. / rank
 
Normal rank
Property / cites work
 
Property / cites work: Q4718428 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Optimal production run length for products sold with warranty / rank
 
Normal rank
Property / DOI
 
Property / DOI: 10.1016/J.EJOR.2006.09.062 / rank
 
Normal rank

Latest revision as of 06:02, 18 December 2024

scientific article
Language Label Description Also known as
English
Inspection scheduling for imperfect production processes under free repair warranty contract
scientific article

    Statements

    Inspection scheduling for imperfect production processes under free repair warranty contract (English)
    0 references
    25 June 2007
    0 references
    EMQ
    0 references
    imperfect production processes
    0 references
    inspection
    0 references
    sequential policy
    0 references
    warranty
    0 references
    0 references
    0 references

    Identifiers